Behind Schedule Review: Story, Cast, Rating & Final Verdict
Last updated: May 10, 2026
Movie Overview: Behind Schedule
| Movie | Behind Schedule |
| Release Year | 1993 |
| Director | Gísli Snær Erlingsson |
| Genre | Comedy |
| Runtime | 95 minutes (1h 35m) |
| Language | IS |
Quick Verdict: Hit or Flop?
Is Behind Schedule (1993) worth watching? According to our cinematic analysis, the film stands as a SUPER HIT with a verified audience rating of 8.0/10. Whether you're looking for the box office collection, ending explained, or parents guide, our review covers everything you need to know about this Comedy.
Cast & Character Study
The performances in Behind Schedule are led by Jean-Philippe Labadie . The supporting cast, including Hjálmar Hjálmarsson and Elva Ósk Ólafsdóttir , provides the necessary layers to the central narrative.
movieMx Verdict: Is it Worth Your Time?
What Works in the Movie
Behind Schedule stands out as a strong entry in the Comedy genre. The film benefits from engaging storytelling, memorable performances, and solid production values that help keep viewers invested.
- Compelling performances from the main cast
- Strong visual storytelling and direction
- Well-structured Comedy narrative
- Satisfying emotional or dramatic payoff
What Doesn't Work
Despite its strengths, Behind Schedule has a few issues that may affect the overall viewing experience, particularly in terms of pacing and narrative consistency.
- Uneven pacing in certain parts of the film
- Some predictable plot developments
- May not appeal to audiences outside the Comedy fanbase
Story & Plot Summary: Behind Schedule
Quick Plot Summary: Released in 1993, Behind Schedule is a Comedy film directed by Gísli Snær Erlingsson. The narrative brings laughter through sharp writing and comedic timing, providing amusement while touching on deeper societal themes. It provides a scannable look at the movie's central conflict involving Jean-Philippe Labadie as André.
Ending Explained: Behind Schedule
Behind Schedule Ending Explained: Directed by Gísli Snær Erlingsson, Behind Schedule delivers a satisfying and emotionally impactful resolution. The ending highlights the core comedy themes developed throughout the film.
The conclusion reflects the central themes explored throughout the narrative, particularly in scenes involving Jean-Philippe Labadie. Many viewers have praised the way the narrative builds toward its final moments.
Key Elements of the Ending
- Narrative Resolution: The main storyline reaches a clear conclusion.
- Character Development: The central characters complete meaningful arcs.
- Thematic Message: The ending reinforces the comedy themes introduced earlier in the film.
The final moments of Behind Schedule leave a lasting impression and strengthen the overall impact of the story.
Who Should Watch Behind Schedule?
Age Advisory: Rated Not Rated.
Highly Recommended For:
- Fans of Comedy cinema looking for quality storytelling
- Viewers who appreciate smart humor and well-timed comedic performances
- Anyone seeking a well-crafted film that delivers on its promises
Behind Schedule Parents Guide & Age Rating
1993 AdvisoryWondering about Behind Schedule age rating or if it's safe for kids? Here is our cinematic advisory:
⏱️ Runtime & Duration
The total runtime of Behind Schedule (1993) is 95 minutes (1h 35m). Directed by Gísli Snær Erlingsson, the film runs for 95 minutes in its complete theatrical version.
Verdict Summary
Analyzing the overall audience sentiment, verified rating of 8.0/10, and global performance metrics, Behind Schedule is classified as a SUPER HIT. It remains an essential part of the 1993 cinematic calendar.
Frequently Asked Questions
Is Behind Schedule worth watching?
Behind Schedule is definitely worth watching if you enjoy Comedy movies. It has a verified rating of 8/10 and stands as a SUPER HIT in our box office analysis.
Where can I find Behind Schedule parents guide and age rating?
The official parents guide for Behind Schedule identifies it as Not Rated. Our detailed advisory section above covers all content warnings for families.
What is the runtime of Behind Schedule (1993)?
The runtime of Behind Schedule (1993) is 95 minutes (approximately 1h 35m).
movieMx Verified
This review has been verified for accuracy and editorial quality by our senior cinematic analysts.
This analysis is compiled by our editorial experts using multi-source verification and audience sentiment data for maximum accuracy.



